top of page

Chou Warehouse Ceremony

On September 29th, Holbrook began construction on Chou warehouse, located in Bangkok. Chou warehouse will be producing environmental products for water treatment.


Before the start of construction, it is tradition to bless the site with a ceremony. The timing and process of the blessing is important to a successful build and prosperous business.


As each client is important to Holbrook a large portion of our staff participated in the ceremony.


Here are some images of the event.

Comments


IG 1 Layer 3 Grid Design (2).jpg

INFORMATION & CONTACT DETAILS

We Now Accept

CRYPTO CURRENCY

good holbrook logo July 2022 no background.png

Designing your vision, Creating reality!

SERVICES

Holbrook Engineering

Holbrook Interior

Holbrook Consulting

Holbrook Manufacturing

Holbrook Property Maintenance

CONNECT WITH US

CONTACT US

  • Facebook

Holbrook

Holbrook Asia
5/144 Moo4 Cheongtalay 
Thalang Phuket 83110

  • LinkedIn

Holbrook

  • Instagram

holbrook.official

bottom of page